|
Work Package 6 - TILDE Standardisation
This Work package focuses on analysing the performance of the TILDE Integrated Tool under diverse conditions found at the four pilot sites.
Failures of the TILDE prototypes will be reported to the consultants and technology providers. The end result of this WP will be the applicability of the TILDE tool as standard product to a wide diversity of water distribution networks.
|